Performing Arts Center

District Performing Arts Center

The former middle school is being converted into a District Performing Arts Center. The auditorium will receive new lighting, sound and restrooms. The gym is being converted into a pocket theater and backstage support for the main auditorium. The former locker rooms will become dressing rooms.

The former tech lab will be converted into classroom space for Extend, the high school's alternative program.



September 1, 2017


On September 8, crews began relocating trees in preparation for the renovations. Five trees will remain in their current location, and five trees will be moved to a different location on the site.

The donated bricks in the flag plaza will be carefully removed and placed in a display wall in the new courtyard.

Performing Arts Construction 2


October 13, 2017

On September 9, USD 490 Board of Education members toured the Performing Arts Center construction site.

Demolition has begun on the instructional wing that will be removed. The roof replacement is well underway and the gym roof is completed.

They have begun constructing the wall of the pocket theater in the gym and are installing plumbing in the Extend classroom area.

The decorative pieces on the exterior of the building are being removed to be re-purposed. The front staircase leading to the auditorium had begun to deteriorate, so it has been removed and a new one is being installed.

The construction team is also tuck-pointing all of the brick work. This simply means that they are checking the mortar around all of the bricks and fixing it where it has become weathered or loose.

PAC pocket theater


November 7, 2017

USD 490 directors toured the Performing Arts Center on November 7.

Chad Duling is the Site Superintendent and Beau Berry is the Project Coordinator.

The classroom wing is prepared for demolition, which will begin the week of November 13.

They are framing the walls of the pocket theater in the former gym. The dressing rooms will be located in the former locker rooms and will be accessible by both the pocket theater and main auditorium.

Some of the former gym seating will be converted into storage space for props and costumes.

In the main auditorium, the seats on the main floor have all been temporarily removed to allow construction crews to add a new sound booth and lay carpet. The auditorium will also receive new lighting.

The auditorium is expected to seat around 800 people after the renovation.

After the classroom wing is removed, a new entrance will be added to the south east side of the building. There will be an event office located inside the new entry. Restrooms will be next to the event office and will be installed on the second and third floors as well.

Part of the former lunch room will be converted into a community room.

On the second floor, a rehearsal space will be located across from the restrooms. While most of the room will receive new sheet rock, one wall will feature the original exposed bricks.

The Extend classroom space will have its own entrance on the northeast side of the building. They will have their own restrooms, laundry service area, and lunchroom.

Performing Arts demo prep